I have two coal bins in my cellar one 8 by 11 that feeds my AA 260 and one the oppisite wall a 8 by 8
neihor has a sloped bottom I ordered a 4inch 3/4 hp 17 foot auger so I can fill the coal bin on the driveway side 8 by 8 and transfer it to the larger bin with out driving over the lawn.
I plan on building a dog house in the new bin.
Would it make much diffrence in the auger is in the middle or closer to one side?
If I put it in the middle the auger would be above the 260
ordered a 8 foot flex hose to direct the coal into the fed bin.
ok what did i forget????
Screw bottom will be Feed Shute will be 5 .5 feet in the air.
I have 12 ton comming
BLACKDIAMONDDOUG