By: franpipeman On: Wed Nov 28, 2012 7:21 am
The per will go through some tight places in the building where pipe fitting would be required but pex can slither through, and and alleviate all pipejoints from boiler room to entry in building. steel pipe is 3.5$ per foot , pex a tad more and no joints as the configuration of the pipe run makes it suitable for the radius of the bends and elevations differences with per . Enclosing it in the corrugated black piping will assure no water infilitration to any type of insulation , while it is not underground it is outside but hidden and it still requires all the insulation it can get as the outside temp will be lower than a buried temp. 100 feet rolls gets me right to outside the boiler room, though inside a building one shot no joints, after that back to sch 40 threaded and coupled into boiler room