Code Enforcement Inspection

Re: Code Enforcement Inspection

PostBy: 4tees On: Sat Nov 15, 2008 1:54 pm

Our town charged me $140 for the permit and inspection. Inspector took around 15-20 minutes...

Took a look at the stove, walked out to look at the power vent, walked back inside and asked me to start the stove, watched it burn a few minutes, asked me what the manometer was,told me that my PV rheostat should be "more secure" (I had it secured with a strap and screw into stone wall).

That's it....
4tees
 
Stove/Furnace Make: Leisure Line
Stove/Furnace Model: Hyfire II with hot air jacket

Visit Hitzer Stoves